PT Surya Pertama Indonesia solar modules
18 solar modules listed under PT Surya Pertama Indonesia.
| Model | PTC W | Costs to run |
|---|---|---|
| LP-590-144MT-W | 561.3 | Not published |
| LP-590-144MT-B | 561.3 | Not published |
| LP-585-144MT-W | 556.4 | Not published |
| LP-585-144MT-B | 556.4 | Not published |
| LP-580-144MT-W | 551.6 | Not published |
| LP-580-144MT-B | 551.6 | Not published |
| LP-575-144MT-W | 546.7 | Not published |
| LP-575-144MT-B | 546.7 | Not published |
| LP-570-144MT-W | 541.9 | Not published |
| LP-570-144MT-B | 541.9 | Not published |
| LP-565-144MT-W | 537.0 | Not published |
| LP-565-144MT-B | 537.0 | Not published |
| LP-560-144MT-W | 532.1 | Not published |
| LP-560-144MT-B | 532.1 | Not published |
| LP-555-144MT-W | 527.3 | Not published |
| LP-555-144MT-B | 527.3 | Not published |
| LP-550-144MT-W | 522.4 | Not published |
| LP-550-144MT-B | 522.4 | Not published |
Computed from electricity at 18.34¢/kWh, the EIA average for US in June 2026. A kilowatt-hour is 3412 BTU. This is a rate times a rating, not a prediction of your bill.
Get told when this changes
A monthly digest of solar modules newly added to the register.
Double opt-in, one click to unsubscribe, and we never sell the list. Privacy.
Source: California Energy Commission solar equipment lists, a public record published for eligibility under California programmes, with a no-warranty disclaimer. Ratings are the manufacturers’ own submissions.