Mundra Solar PV Limited (Adani) solar modules
18 solar modules listed under Mundra Solar PV Limited (Adani).
| Model | PTC W | Costs to run |
|---|---|---|
| AB-G12R-132-620 | 585.9 | Not published |
| AB-G12R-132-615 | 581.0 | Not published |
| AB-G12R-132-610 | 576.2 | Not published |
| AB-G12R-132-605 | 571.4 | Not published |
| AB-G12R-132-600 | 566.5 | Not published |
| AB-G12R-132-595 | 561.7 | Not published |
| AB-G12R-132-590 | 556.9 | Not published |
| ASB-M10-144-580 | 547.2 | Not published |
| ASB-M10-144-575 | 542.4 | Not published |
| ASB-M10-144-570 | 537.5 | Not published |
| ASB-M10-144-565 | 532.7 | Not published |
| ASB-M10-144-560 | 527.9 | Not published |
| ASB-M10-144-555 | 523.0 | Not published |
| ASB-M10-144-550 | 518.2 | Not published |
| ASB-7-385 | 353.5 | Not published |
| ASB-7-380 | 348.7 | Not published |
| ASB-7-375 | 346.0 | Not published |
| ASB-7-370 | 339.3 | Not published |
Computed from electricity at 18.34¢/kWh, the EIA average for US in June 2026. A kilowatt-hour is 3412 BTU. This is a rate times a rating, not a prediction of your bill.
Get told when this changes
A monthly digest of solar modules newly added to the register.
Double opt-in, one click to unsubscribe, and we never sell the list. Privacy.
Source: California Energy Commission solar equipment lists, a public record published for eligibility under California programmes, with a no-warranty disclaimer. Ratings are the manufacturers’ own submissions.